Providing world-leading water technologies

Gibraltar Project

  • Home
  • News
  • Gibraltar Project

The Gibraltar Project

Modern Water together with joint venture partner Northumbrian Water has been selected by HM Government of Gibraltar as preferred bidder to Design, Build and Operate Gibraltar’s wastewater treatment plant, located at Europa Point in Gibraltar, a site with exceptional views visited by thousands of tourists every year. The joint venture is currently carrying out advance works, including preparations for planning permission and site clearance activities

Modern Water plc
12th Floor
6 New Street Square
London
EC4A 3BF
United Kingdom



Tel: +44-(0)20-38273439
This email address is being protected from spambots. You need JavaScript enabled to view it.